This series contains correspondence regarding general policy and project files using a two number series with 'GF' prefix system of arrangement. [It is presumed that the prefix stands for General Files.]
GF00 files contain information on the U.S.I. System, State law, Papers and speeches by Members of Parliament, Reactor Technology and Material, World Energy resources and Surveys, liaison with other Government Departments, State Electricity Commissions of QLD, Vic and NSW, exchange of information with overseas Atomic Energy Authorities [U.K., U.S.A., Japan, India, Belgium and London], World Energy Conference, Mr R. Coles, Mr G. Gray, Disposal and Loss of Equipment, Mr R. W. Carlson, Mr R. Phillips, L.H. Keher, R.H. Nelmes, Nuclear Power Predictions, Reactors, O.E.C.D., Power Developments and Studies in Australia, Standards and Codes and Research Establishment Facilities.
GF01 Files contain information on Insurance; Agreements; Technical Information; Schedules; Steering Committees; Commission meetings; Interdepartmental Liaison; A.A.E.C. Annual Reports, local and international (U.S.) Standards; Tender Policy; Contracts; Requests for Information; Proposals for Approval; Evaluation; Consultants; Bechtel Pacific; Policy and General Contractors - Nuclear Power Station. Potential suppliers such as British Nuclear Design Construction, Atomic Energy Canada Ltd, Westinghouse Electric and General Electric. Also included are Offers of Services, Security, Nuclear Liability, Customs, Transport, Staff, Overseas Visits, Finance, Engineering, Radioactive Waste Management, Research Establishment services, Quality Assurance and Control, Minutes of Meetings, Site Preparation and Improvements, Electricity, Fitouts, Construction, Reactor, Turbine, Instrumentation and Control and Plant Services.
GF02 files contain information on General Projects, correspondence, lists of documents for Westinghouse, Kraftwerk Union A.G., Babcock and Wilcox, General Electric, K.W.U. General, R. and D. Fr., Progress Meetings and Status reports, U.S.I. File System, Staff Training, Lists of Requests, Reactor Physics and Core Performance, Engineering, Capital costs, Questionnaire and Pre-Tender Discussions, Site Improvements and Investigations, Buildings and Structures, Concrete Structure and Shielding, Chemical and Volume Control System, Reactor Coolant and Recirculation Systems, Fuel handling and Storage and Condensing System.